A deep dive inside the IS machine — section timing, mechanism wear, mould cooling and the defect signatures they produce.
The hot-end audit covers everything from gob to lehr. The forming audit is a deep dive inside the IS machine itself — section timing, mould equipment, mechanism wear, mould cooling, and the defect signatures they produce. Most plants need both. Many plants only need this one.
Plunger, neck ring, baffle, takeout, dead plate, pusher — every mechanism inspected, scored, and prioritised.
Settle wave, baffle mark, choked neck, leaner, washboard, bird-cage, stuck ware — mapped to the mechanism that's actually causing it.
NNPB, BB, PB and wide-mouth press-and-blow process windows benchmarked against best-known state.
90 days of defect, downtime and speed data; recent maintenance logs; mould inventory state.
3–5 days per IS machine, full mechanism walk-down, timing diagnostic, defect signature analysis.
Mechanism scorecards, defect mapping, prioritised actions for each IS machine.
Optional 90-day support to close the highest-impact items.
Yes. Our team has run all three. Servo-specific items are covered separately in the audit (precision motion control, servo timing, valve-block calibration).
Not always. Some plants only need the forming audit. We help you scope it on a 30-minute call.
Independent audit of IS machines, forehearth, hot-end coating, ware handling and pack-to-melt KPIs.
The world's first systemised Job Change Tool — SKU Library · Live Execution · KPI Tracking.
End-to-end methodology — planning, SOP, mould preheat, execution, first ware, stabilisation, post-mortem.
Bring a problem — leave with a direction.